
Collab Video Library 2.0
Product
Collab’s Video Library 2.0 houses 200,000+ clips and videos from Collab’s owned and operated channels, clip partners, aggregators and creators
Problem
The old video library needed a modern refresh on both the UI, UX and back end infrastructure. It also lacked features that needed to be added for our users. The current experience wasn’t seamless. We wanted the users to be able to access all features within 2.0 opposed to them being separated within Collab’s Dashboard.
Objectives
- Create 2.0 components with the exact specs for development
- Make every component responsive to page/device size
Challenges
- Catering to every type of users’ needs
- Learning how to work together with engineers to perfect our component QA process
Solution
Create a usable video library with updated features and faster load times responsive on mobile, tablet and desktop
Role
Research, Visual Design, User Interaction, QA
Duration
7/18-Ongoing
Next Steps
We originally wanted to ship 2.0 with the bins and compilations features. MVP shipped with the core features. We will continue to build out bins and comps alongside the design system
Product
Collab’s Video Library 2.0 houses 200,000+ clips and videos from Collab’s owned and operated channels, clip partners, aggregators and creators
Problem
The old video library needed a modern refresh on both the UI, UX and back end infrastructure. It also lacked features that needed to be added for our users. The current experience wasn’t seamless. We wanted the users to be able to access all features within 2.0 opposed to them being separated within Collab’s Dashboard.
Objectives
- Create 2.0 components with the exact specs for development
- Make every component responsive to page/device size
Challenges
- Catering to every type of users’ needs
- Learning how to work together with engineers to perfect our component QA process
Solution
Create a usable video library with updated features and faster load times responsive on mobile, tablet and desktop
Role
Research, Visual Design, User Interaction, QA
Duration
7/18-Ongoing
Next Steps
We originally wanted to ship 2.0 with the bins and compilations features. MVP shipped with the core features. We will continue to build out bins and comps alongside the design system
Design Process
VL2.0 Components
Desktop Designs
Mobile/Tablet Designs

Single Clip Page (L)
Search Filters (R)
iPhone 8